Construction started on this 250 megawatt photovoltaic power plant in 2013, and is expected to be completed in 2015. It is located in the El Dorado Valley, South of Las Vegas, near some other, smaller solar plants. It is being built by AMEC and Sempra Energy, at a cost around $1.5 billion.