Copper Mountain 3 Solar Plant, Mesquite Valley, NV
Construction started on the Copper Mountain 3 Solar Plant, a 250-megawatt photovoltaic power plant, in 2013, and it is expected to be completed in 2015. It is located in the El Dorado Valley, south of Las Vegas, near some other, smaller solar plants that are already online. This area, south of Las Vegas, has a half dozen utility-scale solar plants under construction or online, together capable of providing close to 800 megawatts. This includes the 392-megawatt Ivanpah Solar Plant, built by BrightSource, Bechtel, NRG, and Google, which opened in 2014, just over the state line in California. At least another 1,000 megawatts of solar is planned for the area.